Real Results

Case Studies

See how Danish construction companies use Assurement to cut documentation time, stay compliant, and win more projects.

47 min
Avg. time saved per report
500+
Companies using Assurement
0
Documentation disputes lost
10,000+
Reports generated

From the Job Site

Real tradespeople. Real projects. Real results.

Carpentry

Knudsen Tømrer & Snedker

Odense, Denmark · 12 employees

The Challenge

After long days on-site, the team spent 3+ hours per evening creating KS reports manually. Photos were scattered across personal phones with no structure, timestamps, or GPS data. During a dispute over moisture damage, they couldn't locate the evidence they needed.

The Solution

With Assurement's pre-built control plans and on-site photo documentation, the team now completes reports during the workday. Photos are automatically timestamped and GPS-tagged, and reports generate with one tap.

We used to dread the paperwork. Now we finish a report before we leave the site. That dispute over moisture damage? It would have cost us DKK 60,000 — but we had every photo with a timestamp.

Lars Knudsen, Owner, Knudsen Tømrer & Snedker

Before
With Assurement
Time per report
3+ hours
Time per report
20 minutes
Photo organization
234 unsorted
Photo organization
Auto-tagged
Disputes lost
2 last year
Disputes lost
0 this year
85% less time on documentation
More hours for actual craftsmanship
General Contractor

Byg & Projekt ApS

Aarhus, Denmark · 35 employees

The Challenge

Managing DS1140 static documentation across 8 simultaneous projects with KK2 and KK3 construction classes was a compliance nightmare. The project managers struggled to track the required 10-20% documentation rate, and inspectors had no real-time visibility into progress.

The Solution

Assurement's DS1140 module with pre-approved standard control plans handles KK1-KK4 classes automatically. Project managers and inspectors track documentation rates in real-time from anywhere, and control registration reports generate instantly.

Before Assurement, compliance was our biggest headache. Now our inspectors can see progress in real-time. We passed our last 3 audits with zero findings — that's never happened before.

Mette Sørensen, Project Director, Byg & Projekt ApS

Before
With Assurement
Projects managed
3 at a time
Projects managed
8 simultaneously
Audit findings
4-6 per audit
Audit findings
0 findings
Documentation rate tracking
Manual spreadsheets
Documentation rate tracking
Automatic
Zero audit findings in 12 months
Across 8 simultaneous projects
Independent Inspector

Vestjysk Tilsyn

Esbjerg, Denmark · 4 inspectors

The Challenge

As independent inspectors covering construction sites across West Jutland, they needed to produce appointment reports, supervision notes, and deviation notifications quickly — often on-site with no laptop. Creating legally-compliant reports from handwritten notes took days.

The Solution

Using Assurement on their phones, inspectors now complete reports on-site with pre-filled legal text templates, digital signatures, and instant deviation notifications sent to contractors before leaving the site.

I write my supervision report while I'm still on the scaffolding. The legal text templates alone saved us from hiring a consultant. Our contractors get deviation notices before I'm back in the car.

Henrik Møller, Lead Inspector, Vestjysk Tilsyn

Before
With Assurement
Report turnaround
3-5 days
Report turnaround
Same day
Sites covered per week
8 sites
Sites covered per week
14 sites
Legal review cost
DKK 15,000/mo
Legal review cost
DKK 0
75% more sites covered
With the same team of 4 inspectors

Ready to see results like these?

Join hundreds of Danish construction companies who trust Assurement. Start free — no credit card required.